Definitions #
The steady power needed to keep a reefer container's refrigeration, fans, and controls running while it is stored on land or on a vessel.
Technical The continuous electrical power draw required to operate a refrigerated container's compressor, evaporator fans, and control unit during dwell at a terminal, depot, or onboard a reefer vessel.
Example The terminal charges a daily fee to cover the hotel load of reefers plugged into its reefer points.
Etymology #
A figurative use in transport engineering: the 'hotel' services (lighting, heating, refrigeration) that keep cargo or passengers comfortable, as distinct from traction power for propulsion.
Collocations #
- reefer hotel load The baseline power consumed by a refrigerated container while plugged in and maintaining set temperature.
- hotel load consumption The measured kilowatt-hour usage of stationary powered equipment over a storage period.
- cover hotel load To supply enough generator or shore power to keep refrigeration and auxiliary systems running during dwell.
Real Business Examples #
- Each reefer point at the terminal is metered separately so hotel load can be billed back to the shipping line.
- The genset must run continuously in port because the vessel's shore connection cannot handle the hotel load of forty reefers.
- Power outage during the storm interrupted the hotel load, causing temperature excursions recorded in the reefer's data logger.
Register & Variants #
- Register: technical
- BrE/AmE: Used globally in shipping and reefer logistics; the equivalent term in pure road transport is often 'auxiliary load'.
Synonyms & Antonyms #
- Synonyms: auxiliary load, standby load
- Antonyms: traction load, peak load
Common Errors #
- Treating hotel load as part of the vessel's propulsion fuel consumption Hotel load is the stationary or auxiliary power draw for reefers and onboard services; it is measured and billed separately from main-engine fuel use.
- Assuming hotel load is a fixed figure for all reefers Actual draw varies with set-point temperature, ambient conditions, cargo heat, and fan mode, so billing should rely on metered kWh rather than a flat estimate.
Confusable Terms #
- reefer plug-in fee vs hotel load
- The plug-in fee is the commercial charge for connecting a reefer to terminal power; hotel load is the actual electrical consumption that often drives that fee.
- genset load vs hotel load
- Genset load is total power drawn from a generator, which may include hotel load plus other equipment; hotel load refers specifically to refrigeration and auxiliary running power.
Frequently Asked Questions
Who pays for the hotel load of a reefer at the port?
Typically the shipping line or the party named in the tariff contract, with the cost passed on through reefer surcharges or terminal handling charges depending on the Incoterms and service agreement.
Does hotel load apply only to vessels?
No. It applies anywhere a reefer is powered while stationary, including container terminals, inland depots, rail yards, and trucks running auxiliary generators.
How is hotel load measured?
Usually through individual or pooled electricity meters at reefer points, recorded in kilowatt-hours over the plugged-in dwell time.
Published: 2026-11-21 Category: Logistics