Incoterms · Reference Entry

DPU

//ˌdiː piː ˈjuː//
//ˌdiː piː ˈjuː//
noun Incoterms D-P-U Also: Delivered at Place Unloaded

An Incoterm where the seller delivers and unloads the goods at a named place of destination, bearing all costs and risk until unloading is complete.

Published 2026-10-20 Category: Incoterms Reviewed by Alex Grant, Editor-in-Chief
On this page
Advertisement
Advertisementdisplay · responsive
01

Definitions #

An Incoterm where the seller delivers and unloads the goods at a named place of destination, bearing all costs and risk until unloading is complete.

Technical An Incoterms 2020 term (any mode, including multimodal) replacing DAT, under which the seller places the goods at the buyer's disposal, unloaded from the arriving means of transport, at the named place of destination.

Example DPU is the only Incoterm under which the seller is obliged to unload the goods at destination and bears risk until that is done.

02

Etymology #

Short for 'Delivered at Place Unloaded'; introduced in Incoterms 2020 to replace DAT (Delivered at Terminal), broadening the delivery location beyond terminals to any place.

03

Collocations #

  • DPU named place of destination DPU followed by the place of delivery, which may be a warehouse or a factory.
  • delivered unloaded Delivery after unloading, the feature that defines DPU.
  • Incoterms 2020 DPU is the 2020 term that replaced DAT.
  • place of delivery The point at which risk and cost pass.
  • import clearance by buyer Import clearance, which the buyer normally handles.
04

Real Business Examples #

  1. The contract specified DPU Bonded Warehouse 7, Mumbai, Incoterms 2020, making the seller responsible for unloading at the warehouse.
  2. Because DPU obliges the seller to unload, the carrier's demurrage caused by delayed unloading was charged to the seller.
Advertisement
Advertisementin-article · fluid
05

Register & Variants #

  • Register: formal
  • BrE/AmE: Used worldwide (ICC standard term).
06

Synonyms & Antonyms #

  • Synonyms: Delivered at Place Unloaded, DAT (predecessor, Incoterms 2010)
07

Common Errors #

  • Continuing to quote DAT after 31 December 2019. DAT was replaced by DPU in Incoterms 2020; update contracts to DPU and state the named place, or explicitly reference Incoterms 2010 if DAT is intended.
  • Assuming the buyer arranges unloading, as under DAP. DPU uniquely requires the seller to unload; the named destination must be accessible and suitable for unloading, or costs should be reallocated expressly.
08

Confusable Terms #

DAP vs DPU
Under DAP the goods are delivered ready for unloading (the buyer unloads); under DPU the seller must unload and risk continues until unloading is finished.
DDP vs DPU
DDP additionally requires the seller to clear import and pay duties; under DPU the buyer normally handles import clearance and taxes.
DAT vs DPU
DAT (Incoterms 2010) limited delivery to a terminal; DPU allows delivery, unloaded, at any named place.
09

Frequently Asked Questions

What is the difference between DAP and DPU?

Under DPU the seller unloads the goods and bears risk until unloading is complete; under DAP the buyer unloads, with risk passing when the goods are placed at its disposal on arrival.

Can DPU be used for a destination that is not a port terminal?

Yes. Unlike DAT, DPU allows any named place, such as a warehouse, factory, or inland depot, provided unloading is feasible.

Who pays import duties under DPU?

Typically the buyer; the seller handles delivery and unloading but import clearance, VAT, and duties usually remain with the buyer.